or Select from map

Wind Roses

Wind roses are information-packed plots providing frequencies of wind direction and wind speed. They quickly indicate dominant wind directions and the direction of strongest wind speeds.

The IEM has generated these wind roses based on our archive. The archive does contain errors and non-representative data, so please use care when using these plots. In general, data from airports is of good quality and representative of the local surrounding area.

These images and data are in the public domain. The disclaimer page contains more details.

Dynamic Wind Rose Tool

Create custom wind roses over any time period

Launch Tool

Yearly Climatology

Yearly wind rose for EVM
All-time wind rose based on available historical data

Monthly Climatology

Click any thumbnail to view full-size image
January
February
March
April
May
June
July
August
September
October
November
December

Publications Citing IEM Data (View All)

These are the most recent 10 publications that have cited the usage of data from this page. This list is not exhaustive, so please let us know if you have a publication that should be added.

  • Krzyzanowski, B., K. Beyene, et al. 2025, Ambient Trichloroethylene Exposure and Parkinson Disease Risk in Medicare Beneficiaries. Neurology 2025;105:e214174 https://doi.org/10.1212/WNL.0000000000214174
  • Ghennai, M. and A. Belakehal. 2025, The Impact of the Site and the Local Climatic Conditions on the Design of the Forums in Roman Cities. International Journal of Sustainable Development and Planning Vol. 20, No. 9 https://doi.org/10.18280/ijsdp.200902
  • Henrico, I. and S. Henrico. 2025, Mapping Red Dust Dispersion in Saldanha Bay: Machine Learning Classification Using Open-Source Geospatial Tools. Advances in Cartography and GIScience of the International Cartographic Association, 5, 14 https://doi.org/10.5194/ica-adv-5-14-2025
  • Ahmed, M., H. Soussa, et al. 2025, Numerical modeling of hydrodynamic and water quality impacts of wastewater discharges in coastal Lagoons: A case study of Ria Formosa. Ain Shams Engineering Journal. Volume 16, Issue 8 https://doi.org/10.1016/j.asej.2025.103482
  • Gobran, A., M. Abd-Elhady, et al. 2025, Influence of an Air Slit in Dust Shields on Accumulation of Dust over PV Panels. Fluids 2025, 10, 153. https://doi.org/10.3390/fluids10060153
  • Hung, J., L. Liu, et al. 2025, Autonomous Year‐Round Measurements of O3, CO, CH4, and N2O in the High Arctic With the Atmospheric Emitted Radiance Interferometer. JGR Atmospheres https://doi.org/10.1029/2024JD042847
  • Dilparic, D., M. Graesch, et al. 2025, PFAS in Iowa drinking water sources: Chemical and geospatial patterns. Science of The Total Environment. Volume 977. https://doi.org/10.1016/j.scitotenv.2025.179397
  • Fitzgerald, K. 2025, The Utilization and Deterior The Utilization and Deterioration of T ation of Travertine in Classical, tine in Classical, Baroque, and Fascist Ar ascist Architectur chitecture: A Case Study fr e: A Case Study from Rome, Italy om Rome, Italy. University of Arkansas, Fayetteville. Masters Thesis https://scholarworks.uark.edu/etd/5698
  • Moumane, A., Al Karkour, et al. 2025, Utilizing GIS, remote sensing, and AHP-multi-criteria decision analysis for optimal landfill site selection in Kenitra Province, Morocco: a step towards sustainable development goals. Discov Environ 3, 4 (2025) https://doi.org/10.1007/s44274-025-00183-0
  • Foroughian, S., M. Zandieh, et al. 2024, Evaluation of the effect of semi-open spaces on the ventilation of indoor spaces and the distribution of fine dust. Int. J. Urban Manage Energy Sustainability, 5(4): 198-213. https://doi.org/10.22034/ijumes.2024.2045510.1267